Today headed out to the ride Fishing Lake Road again. Last ride in the area was a bit not doable as Fishing Lake Road was still buried in snow. So today was another attempt to get to the gate on the Monstercross.
Fishing Lake Road Part 2
|
Getting Ready |
|
And It Begins |
|
The Left Turn |
|
The Beginning of The Gravel |
|
BC Like Hydro Tower |
|
Aggressive Foliage |
|
The Gate |
|
Turn Around |
|
Rum In Celebration |
|
Big Ring on The Way Back |
|
Cooked |
|
Done |
Next trip out will be a exploration of the same hydroline from Battersea road. And with that another check off of a ride for 2014 off the list.
No comments:
Post a Comment